Excavation calculator

Calculate the volume of soil or material to be excavated for pits, trenches and sloped-side cuts. Results in m³, cubic yards and truck loads.

Inputs

15%
ExactConservative

Results

Volume (net)

Enter your measurements to see the result

cubic metres (m³)

With 15% buffer

—

m³

Cubic yards (incl. 15% buffer)

—

yd³

Removal trucks

—

@ 6m³ / truck

Litres

—

L

⚠ Add 10–15% buffer to account for over-excavation and soil swell. Actual removal volume may vary depending on soil type.

Related calculators

Related guides

Cubic Yards to Cubic MetersHow to Calculate Concrete Volume

Frequently asked questions

How do I calculate excavation volume?

Multiply length × width × depth to get the volume in cubic metres. For trenches with sloped sides, use the average of the top and bottom width instead of a single width measurement.

How many trucks do I need to remove excavated soil?

A standard dump truck carries about 6 cubic metres of material. Divide your total excavation volume by 6 and round up to get the number of truck loads needed.

Why should I add a buffer to my excavation volume?

Soil swells when excavated — loose soil takes up more volume than compacted soil in the ground. A 10–15% buffer accounts for this swell and any over-excavation at the edges.

What is the difference between a pit and a trench excavation?

A pit is a broad, roughly square or rectangular hole (for foundations or basements), while a trench is long and narrow (for pipes, footings, or drainage). The volume calculation is the same for both.