Concrete calculator

Calculate the volume of concrete needed for slabs, walls, columns, footings and round piers. Results include cubic yards and ready-mix truck count.

Inputs

10%
ExactConservative

Results

Volume (net)

Enter your measurements to see the result

cubic metres (m³)

With 10% waste

—

m³

Cubic yards

—

yd³

Ready-mix trucks

—

@ 6m³ / truck

Litres

—

L

⚠ Estimates are for material planning only. Always order 5–10% extra. Consult an engineer for structural work.

Related calculators

Related guides

How to Calculate Concrete VolumeHow to Mix Concrete by HandConcrete Strength Grades ExplainedConcrete Curing Time Guide

Frequently asked questions

How do I calculate concrete volume?

Multiply length × width × depth to get the volume in cubic metres. For round columns, use π × radius² × height. Always add 5–10% extra for waste and uneven subgrade.

How many cubic yards of concrete do I need?

Convert cubic metres to cubic yards by multiplying by 1.308. For example, 3 cubic metres equals approximately 3.92 cubic yards.

How many trucks of concrete do I need?

A standard ready-mix truck carries about 6 cubic metres (8 cubic yards). Divide your total volume by 6 and round up to get the number of trucks needed.

How much waste allowance should I add for concrete?

A 5–10% waste allowance is typical for most slabs and footings to account for spillage, uneven excavation, and minor measurement errors.